EV Charger Installation
24 Main St., Mastra MA 01247
John Feders
Track your project as it evolves — full visibility from estimate through completion.
MON, JUL 6, 2026
You received an estimate
Atom Electric will run a new 60A feeder from the main panel to the detached garage, set a 100A subpanel, and install a hardwired 48A Level 2 charger.
- Electrical service to garage
- $1,784.00
- EV charger, supplied & installed
- $1,020.00
- Labor
- $628.00
- Estimate total
- $3,432.00
Deposit to schedule, 40% · $1,372.80. See the estimate for full detail.
TUE, JUL 7, 2026
You accepted the estimate
Deposit received — $1,372.80
Thank you. Your job is cleared to schedule.
We scheduled your work
Jul8Weds, 8:00 AMwith Mike R.
WED, JUL 8, 2026
Mike R. is on the way
About fifteen minutes out.
Feeder run started
Trench is open from the main panel out to the garage and the conduit is going in. Subpanel location marked on the garage wall where we talked about it.

Trench open, conduit going in 
Subpanel location marked on the garage wall MRMike ReyesLedge in the trench — rerouted
Hit ledge about twenty feet out from the garage. Walked it with you and we agreed to route around it rather than break rock — quicker, and cheaper than the alternative. While we were out there you asked about the second 60A circuit you'd passed on, and with the trench already open we're adding it. Both are on one change order below. Still finishing today.
MRMike ReyesYou received a change order — $715.00
- Garage feeder rerouted around ledge, ~20 ft
- $181.00
- Second 60A circuit prewired for a future vehicle
- $534.00
- Revised project total
- $4,147.00
You approved the change order
Charger energized
Subpanel set, and the charger is hardwired and energized. Tested at the full 48A. The second circuit is pulled and capped in the subpanel, labeled, ready whenever you need it.

Charger mounted and energized 
100A subpanel, second circuit capped and labeled MRMike ReyesYour project is complete
Trench backfilled, site cleaned, and your permit inspection is booked for Friday. Nothing is needed from you for that — we'll be here.

Plugged in on the new circuit 
Trench backfilled You received an invoice
- Estimate
- $3,432.00
- Change order
- $715.00
- Deposit paid
- − $1,372.80
- Balance due
- $2,774.20
See the invoice for full detail.
Payment received — thank you!
Paid in full by bank transfer.
How did we do?
If Mike and the crew did right by you, a review helps us more than you'd think. It's the main way people around here find us. Look out for a text from us in the next day or two with a link.